000 | 01279cam a22003734a 4500 | ||
---|---|---|---|
001 | 13726194 | ||
003 | The World Bank | ||
005 | 20151125122538.0 | ||
006 | m d | ||
007 | cr cn||||||||| | ||
008 | 040921s2005 dcuab b 001 0 eng | ||
010 | _a2004053638 | ||
020 | _a0821359428 | ||
035 | _a(The World Bank)2004053638 | ||
040 |
_aDLC _cDLC _dDLC |
||
042 | _apcc | ||
043 | _af-ml--- | ||
050 | 0 | 0 |
_aHD1741.M33 _bA94 2005 |
082 | 0 | 0 |
_a333.91/3/096623 _222 |
100 | 1 |
_aAw, Djibril, _d1935- |
|
245 | 1 | 0 |
_aMaking a large irrigation scheme work : _h[electronic resource] _ba case study from Mali / _cDjibril Aw and Geert Diemer. |
260 |
_aWashington, D.C. : _bWorld Bank, _cc2005. |
||
300 |
_axx, 156 p. : _bill., map ; _c23 cm. |
||
490 | 1 | _aDirections in development | |
504 | _aIncludes bibliographical references (p. 144-148) and index. | ||
588 | _aDescription based on print version record. | ||
650 | 0 |
_aIrrigation _zMali. |
|
650 | 0 |
_aWater resources development _zMali. |
|
700 | 1 | _aDiemer, Geert. | |
776 | 0 | 8 |
_aPrint Version: _z9780821359426 |
830 | 0 | _aDirections in development (Washington, D.C.) | |
830 | 0 | _aWorld Bank e-Library. | |
856 | 4 | 0 | _uhttp://elibrary.worldbank.org/doi/book/10.1596/0-8213-5942-8 |
999 |
_c15866 _d15866 |