000 01551cam a22003854a 4500
001 1162560
003 The World Bank
005 20151125122524.0
006 m d
007 cr cn|||||||||
008 960510s1996 dcua b 000 0 eng
010 _a96022845
020 _a0821336703
035 _a(The World Bank)96022845
040 _aDLC
_cDLC
_dDLC
043 _ad------
050 0 0 _aTK1193.D44
_bB33 1996
082 0 0 _a621.31/21
_220
100 1 _aBacon, Robert,
_d1942-
245 1 0 _aEstimating construction costs and schedules :
_h[electronic resource]
_bexperience with power generation projects in developing countries /
_cRobert W. Bacon, John E. Besant-Jones, and Jamshid Heidarian.
260 _aWashington, D.C. :
_bWorld Bank,
_cc1996.
300 _axv, 120 p. :
_bill. ;
_c28 cm.
490 1 _aWorld Bank technical paper,
_x0253-7494 ;
_vno. 325.
_aEnergy series
504 _aIncludes bibliographical references (p. 119-120).
588 _aDescription based on print version record.
650 0 _aElectric power-plants
_xDesign and construction
_xEstimates
_zDeveloping countries.
650 0 _aElectric power-plants
_zDeveloping countries
_xCosts
_xStatistics.
700 1 _aHeidarian, Jamshid.
700 2 _aBesant-Jones, John,
_d1941-
776 0 8 _aPrint Version:
_z9780821336700
830 0 _aWorld Bank e-Library.
830 0 _aWorld Bank technical paper ;
_vno. 325.
830 0 _aWorld Bank technical paper.
_pEnergy series.
856 4 0 _uhttp://elibrary.worldbank.org/doi/book/10.1596/0-8213-3670-3
999 _c14928
_d14928