000 | 01551cam a22003854a 4500 | ||
---|---|---|---|
001 | 1162560 | ||
003 | The World Bank | ||
005 | 20151125122524.0 | ||
006 | m d | ||
007 | cr cn||||||||| | ||
008 | 960510s1996 dcua b 000 0 eng | ||
010 | _a96022845 | ||
020 | _a0821336703 | ||
035 | _a(The World Bank)96022845 | ||
040 |
_aDLC _cDLC _dDLC |
||
043 | _ad------ | ||
050 | 0 | 0 |
_aTK1193.D44 _bB33 1996 |
082 | 0 | 0 |
_a621.31/21 _220 |
100 | 1 |
_aBacon, Robert, _d1942- |
|
245 | 1 | 0 |
_aEstimating construction costs and schedules : _h[electronic resource] _bexperience with power generation projects in developing countries / _cRobert W. Bacon, John E. Besant-Jones, and Jamshid Heidarian. |
260 |
_aWashington, D.C. : _bWorld Bank, _cc1996. |
||
300 |
_axv, 120 p. : _bill. ; _c28 cm. |
||
490 | 1 |
_aWorld Bank technical paper, _x0253-7494 ; _vno. 325. _aEnergy series |
|
504 | _aIncludes bibliographical references (p. 119-120). | ||
588 | _aDescription based on print version record. | ||
650 | 0 |
_aElectric power-plants _xDesign and construction _xEstimates _zDeveloping countries. |
|
650 | 0 |
_aElectric power-plants _zDeveloping countries _xCosts _xStatistics. |
|
700 | 1 | _aHeidarian, Jamshid. | |
700 | 2 |
_aBesant-Jones, John, _d1941- |
|
776 | 0 | 8 |
_aPrint Version: _z9780821336700 |
830 | 0 | _aWorld Bank e-Library. | |
830 | 0 |
_aWorld Bank technical paper ; _vno. 325. |
|
830 | 0 |
_aWorld Bank technical paper. _pEnergy series. |
|
856 | 4 | 0 | _uhttp://elibrary.worldbank.org/doi/book/10.1596/0-8213-3670-3 |
999 |
_c14928 _d14928 |