Estimating construction costs and schedules : [electronic resource] experience with power generation projects in developing countries / Robert W. Bacon, John E. Besant-Jones, and Jamshid Heidarian.

By: Bacon, Robert, 1942-
Contributor(s): Heidarian, Jamshid | Besant-Jones, John, 1941-
Material type: TextTextSeries: World Bank e-Library: ; World Bank technical paper: no. 325.; World Bank technical paperEnergy series: Publisher: Washington, D.C. : World Bank, c1996Description: xv, 120 p. : ill. ; 28 cmISBN: 0821336703Subject(s): Electric power-plants -- Design and construction -- Estimates -- Developing countries | Electric power-plants -- Developing countries -- Costs -- StatisticsAdditional physical formats: Print Version:DDC classification: 621.31/21 LOC classification: TK1193.D44 | B33 1996Online resources: home
Tags from this library: No tags from this library for this title. Log in to add tags.
No physical items for this record

Includes bibliographical references (p. 119-120).

Description based on print version record.

There are no comments on this title.

to post a comment.
Designed & Maintained by: MUALIB
MUA Library, Contact: library@mua.ac.ke

Powered by Koha