Bacon, Robert, 1942-

Estimating construction costs and schedules : experience with power generation projects in developing countries / [electronic resource] Robert W. Bacon, John E. Besant-Jones, and Jamshid Heidarian. - Washington, D.C. : World Bank, c1996. - xv, 120 p. : ill. ; 28 cm. - World Bank technical paper, Energy series no. 325. 0253-7494 ; . - World Bank e-Library. World Bank technical paper ; no. 325. World Bank technical paper. Energy series. .

Includes bibliographical references (p. 119-120).

0821336703

96022845


Electric power-plants--Design and construction--Estimates--Developing countries.
Electric power-plants--Costs--Statistics.--Developing countries

TK1193.D44 / B33 1996

621.31/21
Designed & Maintained by: MUALIB
MUA Library, Contact: library@mua.ac.ke

Powered by Koha