MUALIB
Amazon cover image
Image from Amazon.com
Image from Google Jackets
Image from Coce
Image from OpenLibrary

Computerized management of multiple small projects : Richard E. Westney. planning, task and resouce scheduling, design optimisation, and project control /

By: Material type: TextTextSeries: Cost engineering (Marcel Dekker, Inc.) ; 17.Publication details: New York : M. Dekker, c1992.Description: viii, 357 p. : ill. ; 24 cmISBN:
  • 0824786459
Subject(s): DDC classification:
  • 658.4/04/0285 20
LOC classification:
  • HD 69.P75 W47 1992
Online resources:
Reviews from LibraryThing.com:
Tags from this library: No tags from this library for this title. Log in to add tags.
Holdings
Item type Current library Collection Call number Copy number Status Barcode
Books The MUA Library South C campus - Open Collection STACK 2 HD 69.P75 W47 1992 (Browse shelf(Opens below)) 1 Available 1998-0073

Subtitle on cover: Planning, task and resource scheduling, estimating, design optimization, and project control.

Includes index.

There are no comments on this title.

to post a comment.
Share